Coalbed Methane (CBM) |
|
|
 |
|
 |
Coalbed Methane (CBM):
CBM projects will require the dewatering of coal seams to assist with methane production. If the groundwater is saline (> 4,000 ppm total dissolved solids (TDS)), Alberta Environment (AENV) authorization is not required.
If the project requires the diversion of non-saline groundwater (< 4,000 ppm TDS) from the coal seam, AENV authorization is required, and the Guidelines for Groundwater Diversion for CBM Development must be followed.
| |
A) Complete a Preliminary Groundwater Assessment Report, including: |
| |
 |
A description of the CBM investigation |
| |
 |
The results of a field-verified water well survey |
| |
 |
A detailed assessment of the geology of the project area |
| |
 |
A description and discussion of the hydrogeologic conditions of the project area |
| |
 |
A conceptual Water Management Plan |
| |
This report must be submitted to and approved by AENV prior to drilling / re-completion or groundwater diversion. |
| |
B) Complete a technical report supporting an Application Under the Water Act, including: |
| |
 |
An overview of the existing hydrogeologic information supported by field-verified water well survey data |
| |
 |
Aquifer testing data |
| |
 |
Groundwater quality data |
| |
 |
An operational Water Management Plan |
| |
 |
A cumulative impact assessment |
| |
 |
Groundwater monitoring data and recommendations |
HCL has prepared and submitted hundreds of technical reports to AENV to support groundwater diversions in Alberta.
|
|
|
 |
 |